Dildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo ClearDildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo ClearDildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo ClearDildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo ClearDildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo ClearDildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo Clear

Dildos Electric Eel Gls Curved 7 Glass G Spot Stimulator Dildo Clear

Size:
Colors:
Qty:

Key Features

  • Handblown and handcrafted clear glass 
  • Artisan-crafted & fracture-resistant dildo
  • 7" total length smooth clear shaft
  • Double ended design curved for G-spot stimulation
  • Curved to reach the P-Spot during backdoor play
  • Temperature responsive for sensory play
  • Compatible with all lubricants
  • Hypoallergenic, non-porous & hygienic
  • Easy to clean/Dishwasher safe

Experience undeniably pleasurable stimulation with the Glas 7" G-Spot Stimulator. The bulbous tip provides a deliciously filling sensation and its broad surface provides the coverage that your G-spot needs for a powerful full-body orgasm. At the other end of the glass stimulator is another bulb that allows you to grip onto it as you plunge it into the orifice of your choice

Intelligently designed with a double ended curved shape and ideal length, this dildo easily accesses the G-spot for toe-curling pleasure. The comfortable girth and realistic weight of this toy further enhance its gratifying sensations.

This glass dildo is designed to maximize pleasure for solo and couples intimacy. Its curved shaft hits the ideal pleasure points for an unforgettable experience. Plus, its clear construction allows for unique visual stimulation to further enhance the experience.

This unique and beautifully handcrafted toy from Gläs is made of 100% body safe and shatterproof borosilicate glass. Intended for intermediate to advanced users, these glass toys are easy to use and are compatible with all types of lubricant.

Easy cleaned with soap and water or a toy cleaner, glass toys will never break while in (proper) use, and they also promote safety in other ways, such as by being hypoallergenic and highly hygienic. They are also dishwasher-safe for your convenience.

Includes drawstring storage bag.